//

Notch Area Milestone

  • 29 November 2024

The formwork for the notch area has been successfully completed, paving the way for the execution of the first slab. The Post-Tension Slabs at Mount Khalid have been expertly designed by the international consultant, Strong Force Dubai, ensuring unparalleled strength and precision. To achieve flawless fair-faced concrete, the state-of-the-art PERI Formwork System has been implemented, setting a new benchmark in construction excellence. By combining cutting-edge technology with timeless sophistication, Mount Khalid stands as a testament to precision engineering and sophisticated living. Learn more at www.mountkhalid.com

For details, speak with our team: 
UAN: (051) 111 311 311 
UK Office: +44 7359 490353

#MountKhalid #LivingAtThePeak  #GulbergGreensIslamabad #LuxuryApartments #LuxuryLiving #Islamabad